Golub Corporation Price Chopper


SMRT provided energy advisory and implementation services for the installation of a 200kW natural gas fuel cell, including review of current electric, HVAC and process heating loads in order to maximize the electric and waste heat output from the fuel cell. SMRT calculates the reduction of peak load kW to be 200kW, which is approximately 50% of the store's current load.