This multinational aerospace and defense industry leader has returned to SMRT for projects that include program area fit-ups, infrastructure improvements, cleanroom modifications, and process equipment installation detailing. Many of these projects have ICD 705 classified spaces.
The most recent project was a three-phase build-out. Phase 1 includes classified and unclassified office space, clean assembly, laser test suites, and associated MEP infrastructure.
Phase 2 includes an internal expansion of space simulation and related environmental testing in a classified clean suite with thermal vacuum chambers and shaker tables.
Phase 3 includes a building addition to house final product integration in a classified high bay clean space.