Draper Microfab Cleanroom Consolidation

Since 2011, SMRT has provided engineering and architectural services to Draper Laboratories, with a focus on ICD 705 secure spaces and controlled environments. SMRT’s first project was to consolidate selected research onto a single floor. The goal was to create ISO 4-7 cleanrooms that would enable MEMS and multi-chip module R&D. Designed within an existing…

Confidential Government-Funded Research Client

SMRT was hired to offer master planning, process equipment (tool) planning, design, engineering, and construction administration services. The project objective was to move and consolidate 65 laboratories into a new state-of-the-art Compound Semiconductor Integration Facility spanning 165,000 square feet. The facility includes approximately 35,000 square feet of ISO-4 and ISO-6 space under the filter at…

GE Healthcare Digital X-Ray Detector Manufacturing Facility

Using an integrated engineering and design process, this 230,000-square-foot digital x-ray manufacturing facility was the first clean manufacturing plant of its kind to be LEED Gold certified. Built in 18 months, the facility is a model of green design, accommodating cutting-edge clean manufacturing processes, support utilities, and resource-conscious environmental and control systems in a healthy…

BAE Systems Aerospace Program Fit-Up

This multinational aerospace and defense industry leader has returned to SMRT for projects that include program area fit-ups, infrastructure improvements, cleanroom modifications, and process equipment installation detailing. Many of these projects have ICD 705 classified spaces. The most recent project was a three-phase build-out. Phase 1 includes classified and unclassified office space, clean assembly, laser…